Civil and structural works undertaken by ARIS at Darwin Correctional Centre were part of a $495million PPP project for the Northern Territory government.
The facility spans over 100 hectare of Greenfield site and comprises a 1000 bed correctional centre, a 30 bed Mental health and Behavioural Management Centre and a 50 bed Supported Accommodation and Programs Centre. Other subsidiary buildings include a staff development and training building, drug dog detection unit, horticulture building, laundry and kitchen facilities.
Services included:
- Full 3D bulk and detailed earthworks modelling including erosion and sediment control design.
- Full 3D site services coordination including all in-ground services
- Stormwater quantity and quality modelling Including detailed stormwater analysis in 12D
- Road and pavement design
- Multiple fence designs and set out including the entire steel perimeter fence, and multiple internal steel and precast fences
- Structural design of over 60 buildings including post disaster shelters for cyclonic wind loads
- Integrated framing solutions including block, precast and steel to provide fast erection on site while meeting both architectural and client requirements
- Coordination with both interstate and international steel suppliers to ensure quality of product being supplied to site.










